Engine & Gearbox dummy up. 04/05/08

 We wheeled the motor and box in place for a trial fit. We probably starred at it for an hour after that....

Joe in the drivers seat.

More test fitting and chassis welding. 04/03/08



I was paranoid about the chassis twisting during the welding stage so braces were in place and level checked every 5 minutes.

Engineering the Chassis. 01/03/08

 First dummy up of the diff and front end.

 The agonising first cut of the chassis for the kick up. No turning back now.
 Can never have enough clamps.
Took a couple of goes to get all the angles right but we got there in the end. 

From Deconstruction to Construction. 28/08/07

 Dad checking for twists.
 Machine tapped blocks to replace original nuts and bolts.
 Dummy axle to measure diff length.