Booted..07/02/11

Gemini tank mounted on a frame. Half way in the cab and half way in the boot. Off cuts used to work out how the floor would sit.
Boot floor is made in 3 pieces. It will be riveted in place.


Boot / Cabin devider. Petrol tank sits in the cavity.

No comments:

Post a Comment